Figure 2. Survey sites within a hexagon. Anuran calling surveys were conducted at ten road calling survey points and six wetland calling survey points within each hexagon. Night driving surveys were performed along roads in hexagons. In addition, automated recording systems were utilized within some hexagons to obtain paired wetland recordings (PWR) and method variance recordings (MVR).